Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grand Cherokee
+ Cars of mark Jeep Grand Cherokee
+ Options and routine maintenance
+ Рядный the six-cylinder engine
+ Engine V8
+ Procedure of the general and engine major repairs
+ Systems of cooling, heating and air conditioning
+ The power supply system and release of the fulfilled gases
+ System of an electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of a gear change
- Automatic transmission
   The general information
   Diagnostics of malfunctions - the general information
   Removal and installation of the lever of switching
   Check of a condition and adjustment of a cable of switching
   The description, replacement and adjustment of a cable of a drive throttle заслонки in a mode kik-daun (TV-cable)
   Serviceability check, adjustment and replacement of the gauge-switch of the permission of start
   Adjustment of a cable lay блокиратора
   Check of a condition and replacement of a support of transmission
   Epiploon replacement
   The design description, removal and installation of lines and hoses of cooling of transmission
   Removal and installation of an additional cooler
   Removal and installation of automatic transmission
   Replacement of the module of management with transmission (ТСМ) (only for АW-4 and 42RЕ)
   Diagnostics of system of electronic control by automatic transmission
+ Distributing box
+ Coupling and трансмиссионная a line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of an onboard electric equipment
+ Controls and operation receptions


e65f60b7

Removal and installation of an additional cooler

Details of installation of an additional cooler (transmission 42RН and late 46RН)


 PERFORMANCE ORDER

    Remove a radiator lattice (the Head the Body). Remove the condenser of the conditioner of air if it disturbs to performance of forthcoming work (the Head of System of cooling, heating and an air conditioning). Mark охладительные lines for the purpose of maintenance of a guarantee of correct connection at assemblage. Establish drain capacity under collars of hoses of a cooler. Loosen the clips collars also remove hoses. Give all fixture of a cooler to a radiator and its support.

Details of installation of an additional cooler (transmission АW-4).

Details of installation of an additional cooler (transmission 42RЕ and early 46RН).
    Remove an additional cooler. Check up cooler hoses on presence of cracks and cuts. Cut off the worn out ends of hoses. In case of revealing of defects of the central part of a hose (not on the ends) replace it. Installation make upside-down. Track reliability of a tightening of all fixture and шланговых clips.