Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grand Cherokee
+ Cars of mark Jeep Grand Cherokee
+ Options and routine maintenance
- Рядный the six-cylinder engine
   The general information
   The repair procedures, which performance it is possible without extraction of the engine from the car
   Reduction in position ВМТ of a step of compression of the piston of the first cylinder
   Removal and installation of a cover of a head of cylinders
   Removal, check of a condition and installation коромысел and bars of pushers
   Replacement клапанных springs, their plates and маслоотражательных caps
   Removal and installation of the inlet pipeline / a final collector
   Removal and installation of a head of cylinders
   Replacement of a forward epiploon of a cranked shaft
   Condition check, removal and installation of a cover of a distributive chain, chain and its asterisks
   Removal, check of a condition and installation of a camshaft, bearings and hydraulic pushers
   Removal and pallet installation картера
   Removal, check of a condition and installation of the oil pump
   Removal and installation of a flywheel/privodnogo of a disk
   Replacement of a back epiploon коленвала
   Check of a condition and replacement of rubber pillows of support of the engine
+ Engine V8
+ Procedure of the general and engine major repairs
+ Systems of cooling, heating and air conditioning
+ The power supply system and release of the fulfilled gases
+ System of an electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of a gear change
+ Automatic transmission
+ Distributing box
+ Coupling and трансмиссионная a line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of an onboard electric equipment
+ Controls and operation receptions


e65f60b7

Removal, check of a condition and installation of the oil pump

Removal

 PERFORMANCE ORDER

    Remove the pallet картера (Has undressed Removal and pallet installation картера). Give two bolts of fastening of the oil pump to the engine block.

Details of fixture of the oil pump.

    Separate assemblage of the pump with the mesh filter маслозаборника from the block.

Condition check

 PERFORMANCE ORDER

    Uncover the pump case. Lay on face surfaces of gear wheels of the pump two pieces of the calibrated plastic wire from set Plastigage and establish into place a pump cover, having drawn it with effort 7,9 Н•м.
    Lay on a face surface of gear wheels of the pump two pieces of the calibrated plastic wire from set Plastigage and establish into place a cover - having uncovered, measure width of the flattened out pieces of a wire on a scale on set packing.
    Uncover and measure width of the flattened out pieces of a wire on a scale on set packing. Scale indications correspond to backlash size between the surfaces which have flattened out a wire. In this case the backlash should not exceed admissible values under Specifications for corresponding backlashes of the oil pump. By means of measuring probeа лезвийного type define backlash size between gear wheels and walls of the case of the pump. Compare result of measurements to requirements of Specifications.
    With the help probeа лезвийного type measure a backlash between gear wheels and walls of the case of the pump.

Installation

 PERFORMANCE ORDER

    In case of revealing of defects replace the pump. In the absence of confidence of definition of a condition of its pump also it is necessary to replace. It is not necessary to do attempts of restoration of the old pump. Establish the pump with a new lining, having turned a shaft so that the gear wheel uvula has entered into gearing with шлицом at the bottom end face of a drive of the distributor. The pump should be put into place without effort. In case of resistance occurrence take the pump and correct uvula position, having arranged it according to position шлица a distributor drive. Establish fixing bolts. Tighten bolts with demanded effort. Establish into place the pallet картера (Has undressed Removal and pallet installation картера). Add oils, start the engine and check up it on leaks.