Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grand Cherokee
+ Cars of mark Jeep Grand Cherokee
+ Options and routine maintenance
+ Рядный the six-cylinder engine
+ Engine V8
+ Procedure of the general and engine major repairs
+ Systems of cooling, heating and air conditioning
+ The power supply system and release of the fulfilled gases
+ System of an electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of a gear change
+ Automatic transmission
+ Distributing box
- Coupling and трансмиссионная a line
   The general information
   Coupling - the general description and check of serviceability of functioning
   Removal and installation of components of hydraulic system of deenergizing of coupling
   Removal, check of a condition and installation of components of coupling
   Removal, check of a condition and installation выжимного the coupling bearing
   Check of a condition and replacement of the directing bearing
   Kardannye shaft, differentials and bridges - the general information
   Condition check трансмиссионной lines
   Removal and installation карданных shaft
   Replacement карданных hinges
   Replacement of an epiploon of a shaft of a leading gear wheel of differential
   Removal, service and installation of a nave and bearings (forward wheel)
   Removal, major repairs and installation of a forward power shaft
   Removal and installation of assemblage of the forward bridge
   Removal and installation of a back semiaxis and bearing assemblage
   Removal and installation of assemblage of the back bridge
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of an onboard electric equipment
+ Controls and operation receptions


e65f60b7

Removal, check of a condition and installation выжимного the coupling bearing

The dust developed in the course of functioning of coupling and accumulating on a surface of its components can contain unhealthy asbestos. AT ALL do not blow off a dust the compressed air and do not inhale it. Do not use for removal of a dust by solvents on an oil basis or gasoline. For dust washing off in the pallet it is necessary to use the structures intended for cleaning of brake mechanisms. After end of cleaning and rubbing of components of coupling merge the used cleaner and combine dirty rags in the container marked by respective image.

Removal

Assemblage components выжимного the bearing


 PERFORMANCE ORDER

    Отболтите the executive cylinder from the coupling case (Has undressed Removal and installation of components of hydraulic system of deenergizing of coupling) and take it from the deepening. Tie up the cylinder aside a wire, trying not to bend and otherwise not to damage a hydraulic line.

Do not disconnect a hydraulic line from the executive cylinder - the system is not subject to prorolling in case of hit in it of air!

    Remove from car RKPP (the Head the Manual box of a gear change). Disconnect the lever of deenergizing of coupling from a returnable spring and an axial hairpin, take выжимной the bearing from the holder on primary to a shaft and disconnect it from the lever.

Condition check

 PERFORMANCE ORDER

    Keeping the central part of the bearing, повращайте external, simultaneously creating pressing. If the bearing rotates not smoothly and with extraneous sounds, replace it. Wipe the bearing pure rags and check up it on presence of signs of deterioration, cracks and other damages. Do not lower the bearing in solvent - its factory hermetic sealing which is not subject to restoration will thus be broken. Check up the bearing on presence of signs of leaks, in case of revealing of those replace assemblage. Check up a condition of the lever of deenergizing and an axial hairpin. The hairpin should be hardly tightened. Make sure that the lever is not worn out and not deformed. Examine a returnable spring of the lever - if it погнута or it is damaged, make replacement.

Installation

 PERFORMANCE ORDER

    Installation basically is made in an order, the return to a removal order. Do not forget to grease slightly directing bearing of a cranked shaft, шлицы a primary shaft of the transmission, sliding surfaces of the holder of bearing RKPP, the lever of deenergizing and its axial hairpin. Establish to the place of РКПП (the Head the Manual box of a gear change). Establish into place the executive cylinder of coupling (Has undressed Removal and installation of components of hydraulic system of deenergizing of coupling).