Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grand Cherokee
+ Cars of mark Jeep Grand Cherokee
+ Options and routine maintenance
+ Рядный the six-cylinder engine
- Engine V8
   The general information
   The repair procedures, which performance does not demand extraction of the engine from the car
   Reduction in position ВМТ of the piston of the first cylinder
   Removal and installation of covers of heads of cylinders
   Removal, check of a condition and installation коромысел and bars of pushers
   Replacement клапанных springs, their plates and маслоотражательных caps
   Removal and installation of the inlet pipeline
   Removal and installation of final collectors
   Removal and installation of heads of cylinders
   Replacement of a forward epiploon of a cranked shaft
   Removal, check of a condition and installation of a cover of the distributive chain, the chain and its asterisks
   Removal, check of a condition and installation of a camshaft and hydraulic pushers
   Removal and pallet installation картера
   Removal, check of a condition and installation of the oil pump
   Removal and installation of a flywheel/privodnogo of a disk
   Replacement of a back radical epiploon
   Check of a condition and replacement of rubber pillows of support of the engine
+ Procedure of the general and engine major repairs
+ Systems of cooling, heating and air conditioning
+ The power supply system and release of the fulfilled gases
+ System of an electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of a gear change
+ Automatic transmission
+ Distributing box
+ Coupling and трансмиссионная a line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of an onboard electric equipment
+ Controls and operation receptions


e65f60b7

Removal and installation of final collectors

Removal

Before starting procedure performance allow to the engine to cool down completely.


 PERFORMANCE ORDER

    Disconnect a negative wire from the battery. Disconnect wires from spark plugs and remove candles (the Head of Adjustment and routine maintenance). Give fixing nuts and remove thermofilters of final collectors.
    Remove a thermofilter of a final collector.
    Disconnect tube EGR from the inlet pipeline. Against the stop cock a lay brake and block (wedges) back wheels. Поддомкратьте redock of the car also establish it on props. Disconnect a reception pipe of system of release of the fulfilled gases from a final branch pipe of a final collector.

For отдавания "the become attached" bolts preliminary moisten with their getting oil.

    On a collector established from the passenger party of the car give bolts of fastening of tube EGR and lift the receiver.
    Give two bolts (arrow) of fastening of tube EGR to the final collector established from the passenger party of the engine.
    First of all ослабьте external fixture, then central also separate a collector from a head. The part of fixture of final collectors represents hairpins, therefore preliminary take care of marks of an arrangement of fixture that at hairpin assemblage could be established in a correct order. Besides, pay attention that long remote washers are put on the hairpins used for fastening of thermofilters (between hairpins and screens), keep washers and note places of their installation.
    Note positions of hairpins and remote washers, then remove a collector.

Installation

 PERFORMANCE ORDER

    Installation make upside-down. Smooth out interfaced surfaces of a collector and a head. Remove all traces of a material of an old lining and corrosion from a flange of tube EGR and a surface of the collector established from the passenger party of the engine interfaced to it. Necessarily replace a lining between a flange of a tube and a collector. Establish fixture and tighten it with demanded effort. Move from the collector centre outside, achieving demanded effort of a tightening in three stages. Carving of bolts of fastening to a collector of a reception pipe of system of release of the fulfilled gases grease with preliminary antitaking hermetic, then strongly tighten them.