Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grand Cherokee
+ Cars of mark Jeep Grand Cherokee
+ Options and routine maintenance
+ Рядный the six-cylinder engine
+ Engine V8
+ Procedure of the general and engine major repairs
+ Systems of cooling, heating and air conditioning
+ The power supply system and release of the fulfilled gases
+ System of an electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of a gear change
+ Automatic transmission
+ Distributing box
- Coupling and трансмиссионная a line
   The general information
   Coupling - the general description and check of serviceability of functioning
   Removal and installation of components of hydraulic system of deenergizing of coupling
   Removal, check of a condition and installation of components of coupling
   Removal, check of a condition and installation выжимного the coupling bearing
   Check of a condition and replacement of the directing bearing
   Kardannye shaft, differentials and bridges - the general information
   Condition check трансмиссионной lines
   Removal and installation карданных shaft
   Replacement карданных hinges
   Replacement of an epiploon of a shaft of a leading gear wheel of differential
   Removal, service and installation of a nave and bearings (forward wheel)
   Removal, major repairs and installation of a forward power shaft
   Removal and installation of assemblage of the forward bridge
   Removal and installation of a back semiaxis and bearing assemblage
   Removal and installation of assemblage of the back bridge
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of an onboard electric equipment
+ Controls and operation receptions


e65f60b7

Removal and installation of assemblage of the back bridge

 PERFORMANCE ORDER

    Loosen the nuts of fastening of back wheels, поддомкратьте the car also establish it on props. Remove wheels. Prop up assemblage of the back bridge тележечным a jack got under differential. Give the bottom nuts of fastening of shock-absorbers, compress shock-absorbers, having cleaned them from a way (the Head the Suspension bracket and a steering). Disconnect карданный a shaft from the holder крестовины a shaft of a leading gear wheel of differential and suspend its back part to the bottom of the car by means of a wire piece (Section condition Check трансмиссионной lines). Отболтите a bar of the stabilizer of cross-section stability from a connecting link of the stabilizer (if are provided). Disconnect cables of a lay brake from the equalizer (the Head Brake system). Disconnect a management rod пропорционирующего the valve of the gauge of height from картера the bridge (only for models Comanche). Disconnect a flexible brake hose from a tee on картере the back bridge. Закупорьте the end of a hose or wind with its polyethylene package for the purpose of prevention of losses of a liquid and hit in dirt system. Fix screw springs safety chains in avoidance слетания springs after bridge lowering. Lower a jack and take assemblage of the bridge from under the car. Installation make upside-down. Take care of that nuts of U-shaped bolts and bolts of collars карданного the hinge have been tightened with demanded effort.